
Overview:
Safety Procedures:
- Required PPE:
- Steel-Toe Boots or Green-Toe Caps
- Protective Gloves
- Safety Glasses
- Always test the weight of the coil before lifting. If the coil is too heavy, ask for assistance.
- Always wear steel-toe boots when replacing coils, as they can be extremely heavy.
- After loading a new coil, ensure it is properly mounted and secured before operating the machine.
- Never thread the coil while the machine is in operation.
- Always perform proper lockout/tagout on the main computer before loading and unloading a new coil.
- Always press the emergency stop (E-stop) button before loading a new coil.
- Never block the E-stops on the machine with carts or material.
- Press the emergency stop button on the safety cage before loading a new coil on the intercept machine.

c. Press the emergency stop button on the main control screen before loading a new coil onto the Intergrid or Interscreen machines.

- Only use a hoist or overhead crane to load a new coil.

- Always align the new coil carefully with the mandrel before loading.
- Never lift a coil by hand.
- Keep your hands and fingers away from pinch points when loading a new coil to prevent crushing injuries.
Employees Signed Off On This Safety Document