Created By: Jacob Naylor

Created Date: 11/11/25

Department: IG lines, CGA, PD Final

Overview

The process for ensuring Verified Warranty Inspection IG units meet Amsco’s Glass Inspection Criteria.

Definitions

Verified Warranty Inspection is a quality control process at Amsco that ensures insulated glass (IG) units meet the company's Glass Inspection Criteria through multiple inspection checkpoints. The process involves:

This multi-stage inspection system provides warranty protection by confirming that units meet quality standards at each critical production stage.

Steps

Step 1: IG Lines

  1. Following the Glass Labels process, the Verified Warranty Inspection sticker will be applied to the IG unit.
  2. The team lead of the IG line will ensure the unit meets Amsco’s Glass Inspection Criteria.
  3. The IG line team lead will initial the Verified Warranty Inspection sticker on the designated line for all units requiring an initial.
  4. The IG line team lead will apply an Amsco Windows Glass Inspection Criteria sticker to the IG unit.